EEPower

50A / 1200V Thyristor Offered in Long Leads TO-247 Package


New Products Mar 16, 2016 by Jeff Shepard

Vishay Intertechnology, Inc. today introduced a new 50A, 1200V phase control thyristor in the new long leads TO-247 package. For power switching applications, the Vishay Semiconductors VS-50TPS12L-M3 provides a new medium-power option in the 3-lead through-hole package. The thyristor released today is optimized for line rectification, soft start motor control, and temperature control in UPS units, welding equipment, power converters, industrial battery chargers, and solid-state relays.

A rugged device, the single SCR VS-50TPS12L-M3 features a high surge current to 630A, while its glass passivation technology provides reliable operation to a junction temperature of +150 degrees C. The RoHS-compliant, halogen-free thyristor offers long leads of 20mm for flexibility in PCB mounting, while its high dV/dt of 1000V/µS provides increased EMI immunity.

Samples and production quantities of the VS-50TPS12L-M3 are available now, with lead times of five to 10 weeks for large orders. Pricing for U.S. delivery only starts at $1.10 per piece.