A question about PGP. If I synchronized the PGP output power to the bus bar with two other incomers from external source. If the two incomers fails could the PGP still work and supply the switchboards and the grid? The PGP output 3MW to15MW.
 
The behavior of a pulse generator plant (PGP) in the scenario you described would depend on the specific design and configuration of the PGP and the electrical system it is connected to.

In general, a PGP is a type of electrical power generating system that uses a pulse generator to produce high-voltage electrical pulses. These pulses can be used to drive various types of electrical loads, such as motors, generators, or other types of electrical equipment.

If a PGP is connected to a bus bar and is synchronized with two other incoming sources of power, it may be able to continue supplying power to the electrical system if the other incoming sources fail. However, this would depend on the specific design and configuration of the PGP and the electrical system. For example, if the PGP is connected to the bus bar through a circuit breaker, the circuit breaker may trip and disconnect the PGP from the electrical system if the other incoming sources fail. In this case, the PGP would not be able to supply power to the switchboards and the grid.

It is also possible that the PGP could continue supplying power to the electrical system if the other incoming sources fail, but only if the PGP is designed and configured to operate as an "islanded" system, meaning it can operate independently of the larger grid. In this case, the PGP would need to have its own power generation, voltage regulation, and load management systems to ensure that it can maintain a stable electrical supply to the switchboards and other loads it is connected to.

Overall, the ability of a PGP to continue supplying power to the electrical system in the scenario you described would depend on the specific design and configuration of the PGP and the electrical system it is connected to. It would be best to consult with a qualified electrical engineer or the manufacturer of the PGP for more information on its capabilities and how it would behave in this type of situation.
 